The project involves inspection of existing Globe cell sites, physical evaluation and assessment of the tower’s existing condition. Perform structural analysis, provision of certification for the tower’s structural integrity, as built drawings, preparations of inspection/site condition report as required by concerned LGU for renewal of cell site permit.