Conduct of tailings dam technical assessment based on physical, topographical, hydrological, geological and environment conditions; detailed engineering design and risk assessment study including a risk management plan. The dam has a design capacity of 160,000 cubic meters of mine tailings and with provision for future expansion. It features a High-Density Poly Ethlyne (HDPE) lining material, an innovation in the industry. The facility is equipped with sensors to monitor seepages, levels of saturation and seismicity.