Conduct of tailings dam technical assessment based on physical, topographical, hydrological, geological and environment conditions; detailed engineering design and risk assessment study including a risk management plan. The dam has a design capacity of 160,000 cubic meters of mine tailings and with provision for future expansion. It features a High-Density Poly Ethlyne (HDPE) lining material, an innovation in the industry. The facility is equipped with sensors to monitor seepages, levels of saturation and seismicity.
- 8534 - 6449 / 8534 – 7004 / (+632) 8532 - 8765 / 8532 - 9295 / 8532 - 9504
- (+632) 8533 - 4017
- consult@edcop.ph