The study aimed to determine the technical economic and financial viability of the hydropower component of the Balog-Balog Multi-Purpose project which was under construction. The project is located in the province of Tarlac in Central Luzon. The most favorable option was found to be 3 units of 8MW Francis type Power Plant
- 8534 - 6449 / 8534 – 7004 / (+632) 8532 - 8765 / 8532 - 9295 / 8532 - 9504
- (+632) 8533 - 4017
- consult@edcop.ph