EDCOP was engaged by the joint venture of A-PLUS Development and Construction Corporation and Sta. Clara International Corporation (APDCC – SCIC) to undertake the review, validation, confirmation, project assessment, and detailed engineering design of the 52 MW Chico River Hydropower Project located in Tabuk, Kalinga. The project is divided into two stages, the first stage involves a review of the previous feasibility study, including updating of hydrologic data, among others.
The second stage will cover the detailed engineering design including preparation of tender documents.