The proposed damsite is located in Sitio Culait, Brgy. San Juan in Cabangan, Zambales. The project service area covers around 650 hectares of irrigable lands in eight (8) barangays namely: Arew, San Antonio, San Isidro, San Juan, Sta. Rita, Dolores, Del Carmen and Felmida-Diaz. The proposed development scheme will involve the construction of a central core earthfill dam and appurtenant structures such as spillway, diversion conduit and outlet works. The impounding dam will have a structural height of 48.00 meters. The reservoir area is 20.14 hectares at normal water surface level with a capacity of 0.753 MCM.
- 8534 - 6449 / 8534 – 7004 / (+632) 8532 - 8765 / 8532 - 9295 / 8532 - 9504
- (+632) 8533 - 4017
- consult@edcop.ph