The Sibulan HEP consists of a cascade of two independent hydroelectric projects namely Plant A with an installed capacity of 16 MW and a downstream Plant B with a capacity of about 26.5 MW. It also includes a 16.5 km-long 69 kV transmission line to Davao Light and Power Company substation