MASTER PLAN AND FEASIBILITY STUDY OF FLOOD CONTROL AND RIVER IMPROVEMENT OF BALATUKAN AND IPONAN RIVERS (REGION X) AND MAPANGI RIVER (REGIONS IX & X)
The study covers three (3) principal river basins in the Philippines namely Balatukan, Iponan, and Mapangi River Basins. Balatukan is located in the province of Misamis Oriental (Region X) and Iponan is located in the provinces of Misamis Oriental and Bukidnon (Region X). On the hand, Mapangi is composed of Mapangi, Usugan, and Salug Rivers […]
Master Plan & Feasibility Study of Flood Control & River Improvement of Silag- Sta. Maria and Nayum River Basins
The project was pursued under DPWH’s Medium Term Public Investment Program (MTPIP). The study was monitored and directly supervised by the DPWH’s Unified Project Management Office-Flood Control Management Cluster (DPWH-UPMO-FCMC). The study focused on determining the extent and nature of improvement/construction required based on economic, environmental, and social impacts, and the development of suitable and […]
Philippine Water Supply and Sanitation Master Plan
The Philippine Water Supply and Sanitation Master Plan (PWSSMP) serves as the national action plan to achieve universal access to safe, sufficient, affordable and sustainable water supply, hygiene and sanitation by 2030. Linked to the national water supply and sanitation (WSS) targets, the PWSSMP is grounded on the realities of every region as gathered from […]
Consultancy service for the construction management of proposed Angat Water Transmission Improvement Project (AWTIP) Tunnel 5
The Project is being implemented under a design and build contract. The new tunnel will be approximately 6.43 kilometers (km.) long. The works consist of (i) intake structure at Ipo reservoir, (ii) slope stabilization at intake structure, (iii) tunnel works, (iv) transition basins at Bigte; (v) interconnection of the new Tunnel 4 conveyance channel at […]
BNAQ 7
The new aqueduct AQ7 from Bigte to Novaliches will provide operational flexibility to the raw water transmission system when any of the existing aqueducts will require repair or rehabilitation. It will also provide additional capacity in the case of any future increase in water rights allocation. AQ7 is approximately 15 kilometers long and will start […]
Consulting Services for the Feasibility and Master Plan Study and Environmental Impact Assessment Study for the M’Lang Airport Development Project
The Joint venture of Engineering and Development Corporation of the Philippines (EDCOP) and Schema Konsult, Inc (SCHEMA) was engaged by the Department of Transportation (DOTr) to conduct the feasibility and master plan study and environmental impact assessment for the M’lang Airport Development Project. The objectives of the study were to: to formulate an optimum development […]
Consulting Services for the Feasibility and Master Plan Study for Siargao Airport Development Project
The Joint Venture of Engineering and Development Corporation of the Philippines (EDCOP), Pacific Rim Innovation and Management Exponents, Inc. (PRIMEX) and Philipp’s Technical Consultant Corporation (PTCC) was engaged by the Department of Transportation and Communications to conduct the Feasibility Study and Master Plan Development for the Siargao Airport Project. The study aimed to determine the […]
DepEd Certification Engineer on the PPP School Infrastructure Project No.2012-2 (PSIP II-A)
The Department of Education (DepED) commissioned Megawide Construction Corporation (MCC-Proponent), through Public-Private Partnership (“PPP”), to accelerate infrastructure development and sustain economic growth. PPP for School Infrastructure Project No. 2012-2 (“PSIP-II”) is planned to address the shortage in classrooms, which DepEd estimated to be at least 67,000. The Proponent shall design, finance, and construct school buildings, […]
Lake Mainit Hydropower Project
The 25MW Lake Mainit hydro power project will utilize a 3-km tunnel drilled on the west side of Lake Mainit, Brgy. San Pablo, in the municipality of Jabonga, Agusan del Norte to generate power. Electricity generated by the plant will be sold to the Agusan del Norte Electric Cooperative, Inc. (ANECO) through a 69kV subtransmission […]
Balog Balog Multi-Purpose Project Component
The study aimed to determine the technical economic and financial viability of the hydropower component of the Balog-Balog Multi-Purpose project which was under construction. The project is located in the province of Tarlac in Central Luzon. The most favorable option was found to be 3 units of 8MW Francis type Power Plant