Feasibility Study of Bosigon Irrigation Project
The Project is to be implemented in the municipalities of Labo, Vinzons and Paracale in the province of Camarines Norte. The project’s objective is to provide year-round water supply for irrigation of about 1,631 hectares of agricultural lands which consists of 774 existing irrigable areas and 857 new areas. The proposed scheme will include […]
Waras Small Reservoir Irrigation Project
The Project aims to supplement the irrigation water supply to the existing Rinconada Integrated Irrigation System (RIIS). The RIIS has firmed-up service area of 7,208 hectares but around 2,000 hectares cannot be irrigated during both wet and dry seasons due to inadequate releases from Lake Buhi. The development scheme will include the construction of an […]
Feasibility Study of Cabangan Small Reservoir Irrigation Project
The proposed damsite is located in Sitio Culait, Brgy. San Juan in Cabangan, Zambales. The project service area covers around 650 hectares of irrigable lands in eight (8) barangays namely: Arew, San Antonio, San Isidro, San Juan, Sta. Rita, Dolores, Del Carmen and Felmida-Diaz. The proposed development scheme will involve the construction of a central […]
Feasibility Study and Detailed Engineering Design of Dumuloc Small Reservoir Irrigation Project
The Dumuloc Small Reservoir Irrigation Project is envisioned as a storage scheme to store excess water during the wet season for use during the dry season supply of the existing Dumuloc River Irrigation System (RIS). The area that would be irrigated will increase to 1,232 hectares in the wet season and 990 hectares in the […]
Rehabilitation of Angat Afterbay Dam (Bustos Dam)
The Project includes the detailed engineering design for the rehabilitation of Angat Afterbay Regulation Dam also called the Bustos Dam. The project involves the: (i) replacement of the rubber gates; (ii) rehabilitation of the downstream aprons and retaining walls; and (iii) repair and improvement of pavilion and other site facilities.
Kalaanan Irrigation Project
The proposed development scheme will involve the construction of a zoned earth-rockfill impounding dam across the Digmala River in Barangay Labi, Bongabon, Nueva Ecija. The Project has a service area of about 4,923 hectares within the municipalities of Bongabon and Laur. The proposed impounding dam will have a structural height of 99.0 meters. Its reservoir […]
Maridagao (Kadingilan) Irrigation Project
The Project’s primary objective is to provide year-round water supply for irrigation to 6,555 hectares of agricultural lands in the municipalities of Kalilangan, Pangantucan, Don Carlos and Kadingilan in the province of Bukidnon. The proposed development scheme will include the construction of run-of-the-river dams that will harness the potential of Maridagao River and Kidangin River. […]
Feasibility Study of Tyabanan Small Reservoir Irrigation Project
This project aims to provide year-round water supply for irrigation to about 2,087 hectares of agricultural land in nine (9) barangays of Hinoba-an, Negros Occidental namely: Barangay Alim, Asia, Bacuyangan, Bulua-ngan, Poblacion (Barangay 2), Pook, San Rafael, Sipalay and Talacagay. The proposed project development scheme includes the construction of a 65.0-meter embankment dam with a […]
LRT 2 East
The Line 2 East Project consists of extending elevated tracks of Line 2. Approximately 4.7 kms from its current terminus in Santolan to Masinag market in lower Antipolo along the center-line of Marcos Highway and provision of 2 new stations