Apex Mine Tailings Management Facility in Maco, Compostela Valley

Conduct of tailings dam technical assessment based on physical, topographical, hydrological, geological and environment conditions; detailed engineering design and risk assessment study including a risk management plan. The dam has a design capacity of 160,000 cubic meters of mine tailings and with provision for future expansion. It features a High-Density Poly Ethlyne (HDPE) lining material, an innovation in the industry. The facility is equipped with sensors to monitor seepages, levels of saturation and seismicity.
LRT Line 1 Capacity Extension Project Phase II (Package A)

The project involves the Phase II capacity expansion for the existing LRT Line 1. It is a 15.4 km elevated line with 18 stations running north to south along the Taft-Rizal corridor from Baclaran in Pasay City to Monumento in Kaloocan City in Metro Manila.
Subic-Clark-Tarlac Expressway Project

Subic-Clark- Tarlac Expressway Project is financed under the JBIC special loan through the BCDA. The project consists of 4-lane, two (2) road sections, namely the Subic-Clark- Tarlac Expressway ad the North Luzon Tollway Extension, totaling 91 kms.
NAIA Terminal 2 Project

Project calls for the construction management and engineering services for the second terminal building of the Ninoy Aquino International Airport (NAIA). Aside from the building the consultant is also responsible for the associated improvements for the parking apron, taxiway, drainage system and sewage treatment.
Umiray-Angat Transbasin Tunnel Rehabilitation Project
The Umiray River contributes about 20 – 30% of the raw water for Metro Manila. The diversion facilities which was constructed under the Umiray-Angat Transbasin Project (UATP) became operational on June 2000. The intake facilities is located at Umiray, General Nakar, Quezon, while the outlet facilities is located in Macua, Dona Remedios Trinidad, Bulacan. The water from Umiray River to Macua River is conveyed through a 13 km tunnel (4.30 m. diameter) across Sierra Madre mountains.
Clark Waste Water Treatment Plant Expansion Study

The study identified and evaluated the various options for the expansion and improvement of the waste water treatment lagoon for Clark Water Corporation (CWC).
Angat Dam Water Supply Optimization

The immediate objective of AWSOP was the construction of supply, treatment, and distribution facilities that would utilize an additional abstraction of 15 cubic meters per second (m3/sec), over and above the existing 22 m3/sec, from the Angat Reservoir to meet domestic, commercial, and industrial water demand in Manila until 1996. The goal was to benefit an additional 3.1 million people, including 1.2 million urban poor, with improved water supply.
Sibulan Hydroelectric Power Plant

The Sibulan HEP consists of a cascade of two independent hydroelectric projects namely Plant A with an installed capacity of 16 MW and a downstream Plant B with a capacity of about 26.5 MW, Once completed, this will be inter-connected by a 16.5 km-long 69 kV transmission line to Davao Light and Power Company
Magat River Multipurpose Dam

The dam will provide a year-round water supply for irrigation of 104,000 hectares of agricultural lands and generation of 360 MW of power as its major functions while municipal water supply, recreation and fish culture are secondary purposes. The undertaking involved the construction of an earth fill dam of 115 m-high and 3,960 m-long, uppertenant structures including a spillway on the right abutment, two large diameter diversion tunnels and a hydroelectric plant downstream